Posted by Chaitawat
on August 8, 2022 at 17:40
Nowadays, partial discharge (PD) measurement is one of the most reliable methods to evaluate the insulation conditions of HV apparatus on local problems. The insulation is the key point of the equipment lifetime.
Defect in insulation due to manufacture, assemble or ageing are evidenced by PD generation that accelerates the degradation process causing premature dielectric failure.
Posted by Chaitawat
on August 8, 2022 at 09:32